How professional installation works
Installed by MCS-certified engineers (Fresh Solar). Includes technical survey, electrical certification, and DNO notification. Where your home qualifies, the battery is hardwired to your consumer unit and the energy meter paired; the survey confirms the model-specific household output and whether any backup equipment is included.
Eligible battery configurations
£500
Flat fee per order — covers the whole site visit, hardwiring and smart meter fitting (the smart meter is included at no extra cost). The product page shows current availability; every order remains subject to survey.
Other products or configurations
Self-install
If the product page does not show professional installation, use only the documented charging and appliance-output modes. Ask us before ordering a meter add-on.
What's included
Standard install scope — full transparency
Your install fee covers everything below. The vast majority of homes need nothing more — but if your property needs any of the listed extras, we always quote and agree the cost in writing before any work begins.
Included in your professional install
- Dedicated MCB / RCBO on a spare slot in the consumer unit
- Battery hardwired directly into the consumer unit
- Smart meter / CT clamp wired into the consumer unit
- Up to 5m of cable run (consumer unit → battery, clipped direct or mini-trunking)
- CT clamp on meter tails within 3m of the consumer unit
- Installed by MCS-certified engineers (Fresh Solar), including technical survey, electrical certification and DNO notification
- Commissioning, app pairing & full handover walkthrough
Potential extras (quoted before work)
- No spare slot in the consumer unitAdd RCBO, sub-board or full 18th Edition board upgrade.
- Old wire-fuse / re-wireable boardModern consumer unit upgrade required before install.
- Cable run over 5mRouting through walls, floors, ceilings or external weatherproof trunking.
- Core drilling through masonryPer hole, for cable runs through brick or stone walls.
- Meter more than 3m from consumer unitExtended CT clamp cable run or Henley block required.
- Loft, cellar or restricted accessWorking at height, scaffold or tower hire if needed.
- Weak Wi-Fi at battery locationPowerline adapter or Ethernet run for monitoring.
- Removal of an old battery systemSafe decommissioning and disposal of legacy equipment.
How it works
- 1
Choose professional installation when it is shown for your product and configuration.
- 2
Enter your delivery address so we can confirm coverage and arrange the technical survey.
- 3
We confirm the model, proposed location, consumer unit, cable route, network process and any extra work before installation is agreed.
- 4
We deliver the battery and your install partner contacts you within 5 working days of dispatch to schedule the site visit.
- 5
On the day: installation to the agreed design, meter pairing where included, commissioning and electrical certification.
Prefer to plug in and go instead?
No installer needed. Plug-in batteries plug into a normal 13A socket. Out of the box they run on a timetable: charging in your cheap-rate window and powering your home at peak times.
Optional Smart Meter upgrade (+£200). Add it and the battery powers your home first and soaks up spare solar that would otherwise go unused. It is an upgrade, not a requirement.
Enter your postcode and system details. We confirm installer availability, qualifications, connection requirements and any limits before work is agreed.